Q-SERIES DI HEATER OPERATION / MAINTENANCE MANUAL

8.1.f Overpressure Relief Fitting Replacement

Turn power off to system (see Section 2.3 for Lockout/Tagout

procedures).

Drain system (see Section 8.1.d, Draining the System).

Remove and replace overpressure relief fitting (note orientation of

fitting).

Refill system.

Inspect for leaks.

Figure 8-2

8.2 PREVENTIVE MAINTENANCE SCHEDULE

Init

ial

S

tart

Week

ly

6 M

on

ths

Items

V

isu

all

y

Ins

pe

ct

Tighten

X

X

Process Control / Heater Element Status

X

X

X

Plumbing Leaks

X

X

X

Overpressure Relief Drain & Diaphragm

X

X

X

General Electronics

X

X

X

Solid State Relays (SSR’s)

X

X

X

Main Circuit Breaker

X

X

X

Distribution Breakers & Contactors

X

X

X

Branch Circuit Breakers

X

See following table for details on each item.