Trebor Q-Series Di Water Heater User Manual

Page 19

Advertising
background image

Q-SERIES DI HEATER OPERATION / MAINTENANCE MANUAL

PAGE 19

Button F4 (

) switches the display to the Alarm page

Button F5 (

) switches the display to the Home page

F1

F2

F3

F4

F5

Figure 5-3: Configuration Page

5.2.d Plot Page

The Plot page is used to observe the status change of the process
temperature (PV with solid line) with relationship to the set point value
(SP with dashes) during 2 minutes of time in 5 second intervals. The plot
time starts when the page is entered and will only continue while the plot
page is selected. Whenever the plot page is exited and returned, the plot
will again start plotting. The plot page will not continue to plot when not
on the plot page. Why? That is how the plot works in the display unit.

The only navigation button defined on this page is to return to the Home
page:

Button F5 (

) switches the display to the Home page

Advertising