Baseline Systems BaseStation 6000 User Manual

Page 83

Advertising
background image

P a g e

| 75

5. In the Starting Zone field, click the up arrow or down arrow

(4)

so that the zone where

you want the test to start is visible in the field.

6. Type a number in the On Time In Seconds

(5)

field

to indicate how long each zone will

run during the walk around test.

7. Type a number in the Seconds before Starting field to indicate how long the system will

wait before starting the first zone. This delay gives you time to go to the zone location so

you can observe the test.

8. When you are ready to begin the walk around test, click Start

(6)

. If necessary, you can

click Pause or Cancel to stop the walk around test.

Advertising