Maintenance 8” model, cont, Stem sub-assembly and valve cover – Baseline Systems BHM Series Hydrometer User Manual

Page 37

Advertising
background image

Hydrometers Operation and Maintenance Manual

37

Maintenance 8” Model, Cont.

STEM SUB-ASSEMBLY AND VALVE COVER

Follow this procedure only if it is necessary to replace the stem

bearings or the valve cover. Otherwise, skip this section:

Dis-assembly and Re-assembly

• Inspect the upper stem bearing wiper (36). Replace as necessary.

• Remove the upper stem bearing (37) from the stem (41).

• Inspect the upper stem bearing o-rings (38,39). Replace as

necessary.

• Unscrew and remove the stem locking nut (48), located at the

bottom of the stem subassembly.

• Remove the valve cover (47) from the stem. Inspect the rubber for

cracks and excessive wear. Replace as necessary.

• Inspect the valve cover o-ring (43) and replace as necessary.

• Remove the retaining ring (46) that holds the lower stem bearing

wiper (45) in place. Inspect the lower stem bearing wiper (45) and

replace as necessary.

• Inspect the lower stem bearing o-ring (44) and replace as

necessary.

• Inspect the lower stem bearing (42) for scratches or wear. Replace

as necessary.

• Apply Loctite 270 or similar glue to the threads of the lower stem

bearing and screw it into the stem assembly (41).

• Replace the valve cover (47) onto the stem assembly.

• Apply Loctite 270 or similar glue to the threads of the stem

locking nut (48) and screw into the stem assembly.

• Push the upper stem bearing (37) onto the stem assembly.

Advertising