Dell UPS 10000R User Manual
Page 29
Advertising
29
Installation
|
AC Mains
Wall
2-Pole
Breaker
UPS
Line
Neutral/L2
Figure 19. Circuit Breaker Diagram
To hardwire the UPS input:
1
Switch off utility power at the distribution point where the UPS will be connected. Be absolutely
sure there is no power.
2
Remove the terminal block cover (two screws) and retain.
Terminal Block
Cover
Knock-out Hole
Figure 20. Removing the Terminal Block Cover
Advertising