Heading2 - 4.6 replacing a load cell, Numbered - 2. remove the weighplate, Numbered - 7. remove the column – Salter Brecknell S122 User Manual

Page 33: 6 replacing a load cell

Advertising
background image

4.6 Replacing a load cell

4 Installation/Maintenance

S122

User /

Service Instructions

33

4.6

Replacing a load cell

1.

Switch off and disconnect the

scale

from the

AC

power supply.

2.

Remove the

shroud

.

3.

Disconnect and remove the indicator from the column.

4.

Remove the knob from the bracket and slide the hinge
apart slightly so that the plug can be threaded through
the cent

er

of the bracket. Reassemble the bracket.

5.

Remove the bracket from the top of the column.

6.

For

legal for trade scales

, remove the

grounded

connection.

7.

Remove the column.

8.

Remove the two clips holding the cable to the platform.

9.

Remove the four M8x 20mm socket head screws and
remove the

load bridge

.

Note: these bolts will be very tight.

10. Turn the platform over and remove the four M8x 20mm

socket head screws holding the load cell to the platform.

Note: these bolts will be very tight.

11.

Remove the load cell. Desolder the plug and retain.

To replace the load cell, reverse the above procedure and
resolder the plug if necessary.

Torque settings for all bolts to the load cell are:

440 pound-force

.

Advertising