CellarPro 4200VSI-B BEER REFRIGERATION SYSTEM, 2177 User Manual

Page 14

Advertising
background image


14

V9.14

Installation Notes:

1. The unit is shipped with (4) wall mounting brackets, a 90° drain elbow, and a

10’ length of ½ ” I.D. condensate drain line. The required hardware is
shipped loose with the unit.

a. Model 3200VSi / 4200VSi (indoor installations): Select the desired set of

mounting holes, location #1, #2, or #3 (shown above). The mounting
brackets can be used on either side of the wall.

b. Model 3200VSx / 4200VSx (outdoor installations): The rear cover uses hole

location #1. If this is also the desired location for the mounting brackets,
first make certain the rear cover is in place, and then install the mounting
brackets over the rear cover.

2. If the mounting brackets are used on the outside of the cellar in Location 1, a

shelf will be needed to support the weight of the cooling unit.


3. To attach the mounting brackets, attach the side and top brackets to the

unit using (8) #8x3/8” sheet metal screws. The bottom bracket only attaches
to the side brackets – there are no mounting holes for the bottom mounting
bracket in the case of the cooling unit. Secure the top and bottom brackets
to the side brackets with (4) ¼-20x5/8” bolts and lockwashers (included).


4. Attach insulated foam tape to the mounting brackets on the side that will

face the wall to create an insulated and airtight seal between the wall and
the brackets.

5. Once the cooling unit is installed, all cracks and gaps between the cooling

unit and the cellar should be sealed. A complete and proper seal must be
made between the cellar and the cooling unit to ensure that outside air does not
enter the cellar. Use sealant tape or caulking to seal the perimeter where the
cooling unit touches the cellar. Check the seal by having a helper stand in front
of the cabinet while you shine a flashlight around the cooling unit edges to
discover any gaps in sealant.

6. Thread the drain elbow tightly to the condensate overflow drain line.

Thread tape is not required. Run the overflow drain tube to a gravity drain,
routing so that the tube forms a water trap near the unit. Charge the tube
trap with water, then slide the ½ ”ID vinyl tubing over the hose barb.


Advertising