Fig. 11, Step 5), Step 4) – EFCO 904 Series User Manual

Page 21: Fig. 10, Step 3), Vertical intermediate and 2 piece jamb

Advertising
background image

MULLION
FACE

[FIG. 11]

JAMB FACE

DPS 7/2001

JAMB BACK

attachment screws using the drilling templates on pages 11 & 12.

If horizontal intermediates are incorporated, drill for shear block

Slide the mullion face onto the mullion back as shown in Fig. 11.

Typical drilled members are shown in Fig. 10 below.
Jamb members will have preps on one side only.

Cut length for the vertical mullion and jamb face is similar.
Please refer to chart ’A’ on page 17 and notching required

See Section IV B for installation procedures.

MULLION BACK

STEP 5)

shown on page 18.

STEP 4)

9578

[FIG. 10]

9575

STEP 3)

PAGE 19

(CONT.)

SECTION III E - FABRICATION

VERTICAL INTERMEDIATE AND 2 PIECE JAMB

(BUTT GLAZED and CAPTURED MULLION SYSTEMS)