Step 6), Fig. 39, Intermediate horizontal – EFCO 904 Series User Manual

Page 38: Step 5), Fig. 38

Advertising
background image

Systems 901 and 903 use K-143.
Systems 902 and 904 use K-142.

HORIZONTAL BRIDGE

vertical. Correct sealing is important in this step.

The horizontal bridge is intended to prevent any water in the glazing
pocket from running down the butt glazed vertical intermediate at the

STEP 6)

BUTYL TYPE SEALANT.

SEAL AROUND BRIDGE
WITH NONHARDENING

GASKET RACE

RUN SEALANT INTO

[FIG. 39]

JDA 2/14/02

BUTT GLAZED

HORIZONTAL

MULLION

INTERMEDIATE HORIZONTAL

BUTYL TYPE SEALANT

SECTION IV D - INSTALLATION

CAPTURED VERTICAL

CAPTURED JAMB SHOWN,

INTERMEDIATE IS SIMILAR.

902 SIMILAR

904 SYSTEM SHOWN

STEP 5)

HWD1

"V" NOTCH

NOTE:

HORIZONTAL

WATER DEFLECTOR

NOTCH LEG AT

TOWARD THE EXTERIOR.

POSITION WITH NOTCH

[FIG. 38]

PAGE 36

(CONT.)

Quick Set

Water deflectors are used at both ends of horizontal intermediates and

are intended to divert any water in the glazing pocket from reaching and

eventually sitting on top of the insulated glass unit below. Water

deflectors are not used with V.B.G. mullions or with 901 and 903.

See Fig. 38 below.

Advertising
This manual is related to the following products: