2pc. jambs and intermediate verticals, Fig. 31, Fig. 30 – EFCO 904 Series User Manual

Page 33: Step 5)

Advertising
background image

ESTABLISH THIS CLEARANCE.

MULLION CUT LENGTHS THAT

SEE CHART ’A’ ON PAGE 17 FOR

CLEARANCE VARIES

2pc. JAMBS AND INTERMEDIATE VERTICALS

mullions. Check every third mullion for correct spacing.

Tap vertical mullion tight against the can fillers already in place.
Then repeat the installation of the next can fillers and vertical

SECTION IV B - INSTALLATION

After the vertical mullion is in position, let it move back

CAN FILLERS

POSITION AGAINST THE

TILT THE LAST VERTICAL INTO

This will allow tilting the last vertical mullion into place.

Install the last can filler of a run before the second to last.

UNTIL THE LAST VERTICAL IS INSTALLED

THESE CAN FILLERS ARE HELD OFF

[FIG. 31]

FACES of MEMBERS

MOVE BACK to FLUSH

MULLIONS INSTALLED TO HERE

CAN FILLERS AND VERT.

See Fig. 31 below.

NOTE:

STEP 6)

CAN FILLERS INSTALLED

SEALANT

[FIG. 30]

flush with the exterior face of the head and sill cans.
See Fig. 30 below.

STEP 5)

DPS 7/2001

PAGE 31

(CONT.)

Advertising