Fig. 27, 2 pc. jamb anchor clip installation [fig. 26, 2 pc. jambs and intermediate verticals – EFCO 904 Series User Manual

Page 31

Advertising
background image

2 pc. JAMB, TYP.

[FIG. 27]

ANCHOR CLIPS ARE
REQUIRED AT THE
HEAD AND SILL CAN.
ONLY AT PERIMETER
JAMBS.

DPS 7/2001

NOTE:

SILL GLAZING LEG AND ACROSS

TYPE SEALANT AT THE HEAD AND

THE TOP OF THE END DAMS.

APPLY A HEAVY COAT OF BUTYL

AFTER THE JAMB IS IN PLACE,

THE JAMB-HEAD/SILL IN THE
GLAZING POCKET.
THIS STEP IS AT THE JAMBS ONLY.

AFTER THE JAMB IS IN PLACE,
SEAL ACROSS THE JOINT OF

2 pc. JAMB ANCHOR CLIP INSTALLATION

[FIG. 26]

STANDARD HORSESHOE

INSIDE

END DAM

INSIDE

SHIM, TYPICAL.

K434 for S903/S904

K433 for S901/S902

ATTACH THE 2 pc. JAMB

3" FROM TOP AND BOTTOM
AND 24" O.C. MAXIMUM.

TO THE SURROUND

2 pc. JAMBS AND INTERMEDIATE VERTICALS

SECTION IV B - INSTALLATION

will align the head and sill cans as it is installed.

The back member of the (2) pc. jamb and the intermediate vertical

END DAM

(CONT.)

PAGE 29