Insulbar intermediate vertical, Notching at top of mullion, Fig. 12 – EFCO 904 Series User Manual

Page 22: Step 1), Step 2) step 3), S902

Advertising
background image

[FIG. 12]

T

O

P

O

F

MU

LL

IO

N FACE

BAH 4/2005

1/8

"

NOTCHING AT TOP OF MULLION

2"

9547

3" (VARIES)

9546

1/4"

3/32"

to all solid vertical intermediate mullions with 1" glazing.

The 2" dimension taken from the exterior face will be applicable

PAGE 20

STEP 1)

SECTION III F - FABRICATION

STEP 2)

STEP 3)

as shown in Fig. 12 below.

INSULBAR INTERMEDIATE VERTICAL

Notch the top of the mullion face 1/8" x 1/4" as shown in Fig. 12.
This prep is for ease of installation of the vertical mullion.

Cut the thermal strut vertical mullion to the length shown in [CHART "A"]

Notch the TOP of the mullion to leave the appropriate portion

on page 17 (SECTION III E - FABRICATION).

1

1

/2

" @

#

8716

CA

N

1 5/

32"

@

#9468 &

#9477 CA

N

1 17/

32"

@

#9484 &

#9485 CA

N

1 5/

8"

@

1G66

I

-B

A

R

C

A

N

{

S902

{

S904

COMPOSITE #1G41 SHOWN
OTHER MULLIONS ARE SIMILAR

Quick Set

Advertising
This manual is related to the following products: