3 load cell replacement procedure – Rice Lake Counting Scales - IQ6500 Installation and Operation Manual User Manual

Page 37

Advertising
background image

34

10.3 Load Cell Replacement Procedure

1. Disconnect power to scale.

2. Remove platter.

3. Remove four spider assembly screws, then remove spider assembly. For dual platter scales, repeat for

second spider assembly.

4. Remove two bottom and two top screws holding front panel.

5. Slide front panel forward to disengage tabs on cover.

6. Remove plastic cover (4 screws) under spider assembly.

7. Remove ground cables (one screw per assembly).

8. Remove hold-down screws from load cell assembly. For dual platter scales, remove 5 screws for the

large load cell and 4 screws for the smaller load cell. One hold-screw for the smaller cell is also a
ground wire screw and should already be removed.

9. Lift out mounting assembly. For dual platter scales, remove spacers under rear of the large load cell

mounting assembly.

10. Unsolder load cell wires (color-coded guide on board). Overload screws should not need adjustment

even if recalibrating to a different capacity.

11. Reverse procedure for reassembly.

Spacer

Spacer

Load Cell

Load Cell

Advertising
This manual is related to the following products: