Series, 2 installing components, 3 selecting the location – Rice Lake Ranger Count 3000 Series, Ohaus User Manual

Page 4: 4 leveling the equipment

Advertising
background image

EN-2

Ranger™ Count 3000

Series

2.2 Installing Components

Install the sub-platform & metal pan as shown below. Press to lock the sub-platform into place.

The scale can be operated without the pan, if desired.

Figure 2-1. Installing sub-platform and metal pan

2.3 Selecting the Location

Use the scale on a firm, steady surface. Avoid locations with excessive air current, vibrations,

heat sources, or rapid temperature changes. Allow sufficient space around the scale.

2.4 Leveling the Equipment

The Ranger Count Series has a level indicator as a reminder that the scale should be leveled

for accurate weighing. To level the scale, adjust the feet so the bubble is centered in the circle.

Be sure the equipment is level each time its location is changed.







Figure 2-2. Level indicator











Level Indicator

Adjustable feet

Advertising