Assemble Deck Modules

7

3.1

Place End Module A

Before lifting the A module from the truck, place four 5 1/2" temporary setting blocks on the concrete foundation at
each of the four corners. Also re-measure the overall distance between approaches. The OTR series is undersized 1
1/2". When installed in a 70' opening, there will be a 3/4" gap between the approaches and the scale. Minor
adjustments can be made when setting the first module to equally space the scale between approaches.

Depending on foundation and clean out requirements, a different size of setting blocks may be needed.
Assembly instruction references an 18" approach profile for a 5 3/4" clean out. Adjust as needed for your
application needs.

Figure 3-3. Module Positioned on Temporary Setting Blocks

Position each setting block so that it does not interfere with installation of the load cell mounts.

Place module A with the straight end 3/4" from the concrete bulkhead. With 5 1/2" setting blocks, the deck surface
is 1/4"-3/8" from the top of the concrete approach. Square this module with the approach and check that the
side-to-side dimensions are the same.

Figure 3-4. Setting Modules in Place

Before installing the B module, check that no debris has fallen into the two pin-connection receptacles.