12. Install one washer and one nut on each anchor bolt. Place a driver pipe on top of the bolt and use the long

punch to seat the anchor bolts against the baseplate. Tighten anchor bolt nuts.

Figure 4-10. Seating Anchor Bolts on Baseplate

13. Attach one end of the ground strap to the upper block.

14. Insert a bolt through the wire terminal on the loose end and thread the bolt into the hole on the baseplate.

Tighten the bolt securely with a wrench.

Figure 4-11. Ground Strap

4.3

Mount Block and Grout Installation (Option 2)

Use the following steps to install mount blocks and baseplate grout:

1. Adjust leveling bolts until radius of block comes in contact with rocker link radius.

2. Jack the weigh module and remove setting blocks.

3. Slowly lower the weigh module until it rests on the load cell links.

After the weigh module is lowered into final position, check each load cell mount assembly to ensure that the
link is plumb and that there is no binding or misalignment.

4. Use an industrial hammer drill (see Figure 4-8 13) to drill a 3/4" hole into the concrete at least 6" deep on

one side of the mount frame.

5. Drill a second anchor bolt hole on the opposite side of the mount frame.

6. Each mount requires two anchor bolts to prevent longitudinal motion of the baseplate. Anchor bolts (7" x

3/4") with expansion heads are supplied with the scale (see Figure 4-9 13).