0 load cell wiring, Load cell wiring, 16 otr truck scale assembly instructions – Rice Lake SURVIVOR OTR Steel Deck User Manual

Page 20: Cable to indicator, Pocket 4 conduit pocket 6 conduit, Pocket 4 conduit pocket 5 conduit, Module c

Advertising
background image

16

OTR Truck Scale Assembly Instructions

5.0

Load Cell Wiring

Electrical conduit is pre-installed at the factory and only needs to be connected between the modules and from the
modules to the junction box (J-box). Following conduit work, load cell cables are routed through each conduit from
the load cells to the J-box. All load cell cabling used for this installation comes in the shipping container. The
layout pattern for the electrical conduit on a three module truck scale installation is shown in Figure 5-1.

Figure 5-1. J-Box Wiring and Conduit Runs for a Four Section/Three Module Scale

Load Cell
Cable to
Connector

Pocket 1 Conduit

Pocket 8 Conduit

Pockets 1, 2, 3, 4
Conduit runs to J-Box

Pocket 5 Conduit

Module A

Module B

Pocket 3 Conduit

1

8

2

7

SI - Green

SI - White

EX - Red

EX - Black

SHD - Shield

+

-

+

-

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

J3

J4

J7

J8

J6

J5

J2

J1

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

Load Cell #1

Load Cell #3

Load Cell #8

Load Cell #6

Load Cell #2

Load Cell #4

Load Cell #7

Load Cell #5

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

SHD - Shield

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

Indicator/J10

Expansion/J9

Cable to Indicator

SI - Green

+

SI - White

-

EX - Red

+

EX - Black

-

SEN - Yellow

-

SEN - Blue

+

Pocket 4 Conduit

Pocket 6 Conduit

6

3

Pocket 4 Conduit

Pocket 5 Conduit

5

4

Module C

Advertising
This manual is related to the following products: