Load Cell Mount Installation

13

Figure 4-7. Recheck Link for Binding

6. Jack the weigh module and remove the setting blocks.

7. Slowly lower the weigh module until it rests on the load cell links.

8. Use an industrial hammer drill to drill a 3/4" hole into the concrete at least 6" deep on one side of the

baseplate (see Figure 4-8).

Figure 4-8. Drill Anchor Bolt Holes

9. Drill a second anchor bolt hole on the opposite side of the baseplate.

10. Each mount requires two anchor bolts to prevent longitudinal motion of the baseplate. Anchor bolts

(7" x 3/4") with expansion heads are supplied with the scale (see Figure 4-9).

Figure 4-9. Anchor Bolts with Washers

11. Insert bolts into holes drilled in the foundation.