OTR Truck Scale Assembly Instructions
Figure 6-2. Electric Concrete Vibrator
1. Begin pouring at one of the end modules, thoroughly vibrating the concrete to work it into the inside of the
main beams and around the shear connectors (see Figure 6-3).
Figure 6-3. Pouring Concrete into Module
2. Strike off and screed the concrete to further settle the concrete and level the surface (see Figure 6-4).
Figure 6-4. Screeding Concrete