Rice Lake SURVIVOR OTR Steel Deck User Manual

Page 24

Advertising
background image

20

OTR Truck Scale Assembly Instructions

Figure 6-2. Electric Concrete Vibrator

1. Begin pouring at one of the end modules, thoroughly vibrating the concrete to work it into the inside of the

main beams and around the shear connectors (see Figure 6-3).

Figure 6-3. Pouring Concrete into Module

2. Strike off and screed the concrete to further settle the concrete and level the surface (see Figure 6-4).

Figure 6-4. Screeding Concrete

Advertising
This manual is related to the following products: