Leica Geosystems GPS System 500 - Technical Reference Manual User Manual

Page 146

Advertising
background image

146

5. Configuring the Receiver

Technical Reference Manual-4.0.0en

Last Point - Use the last recorded
point.
Known Point - Use any point in the
job. The point can be defined when
running Stakeout.
Line - Orient parallel to any line
defined in the current job. The line
can be defined when running Stake-
out.
Arrow - Shows an arrow on the
graphical side of the stake-out panel.
Simply walk in the direction of this
arrow to find the point to be staked
out.

Use Beep - Will make the system
beep whenever you are within the
distance of the chosen target point
set in Dist from Pt.

Diff Check - Possible options to
check the difference between the
design coordinates and the staked
coordinates are by Height only,
Position only, Pos + Hgt or not to
check the difference at all (None).

This functionality will make the
system automatically display the
differences if the defined Limit is
exceeded.

Use DTM - Appears when the DTM
Stakeout option has been purchased
and enables you to use a Digital
Terrain Model as the height datum
and will show cut and fill values
relative to the DTM. DTMs are stored
on the PC card or sensor internal
memory.

When ASCII File is selected in Stake
from
, the ASCII (F4) key becomes
available. Use this to define the
format of the ASCII file.

Delimiter - Sets the character used
to separate the various point compo-
nents. Choose from Comma (,), Line
Feed
(new line), Semicolon (;), and
Space (blank).

ID Pos - Sets the position of the Point
Id.

Advertising