7. Measuring with System 500

Technical Reference Manual-4.0.0en

Procedure
Grid
is selected as the Stake Type
when entering Stake-Out.

The “as staked” points will always be
stored in the Job. If staking from an
ASCII file, you may also choose to
store the Target points defined there
in the Job. In this way you have the
Target points and the “as staked”
points in one Job.

To start Grid Stake-Out, press CONT
(F1).

Stake-Out starts. Select the
orientation.

Then move to the Target field (shown
empty here). You must select a line
as the target. Press ENTER.

You may select the line from this
panel. If no lines are defined (as
here), press NEW (F2) to define one.

Descriptions of how to define lines
are given in section 7.5.4 (Although
this section is concerned with
orientation, the principles of defining
lines are exactly the same).

When you have selected/defined a
line, use the PARAM (F5) key to
define the grid parameters.

Station Beg - The distance along the
Reference Line to the first grid point.
Horz Offset - The Horizontal Offset
from the Reference Line to the first
grid point.
Vert Offset - The Vertical Offset from
the Reference Line to the first grid
point.