Assembly procedure – Cannon Instrument CAV-2000 User Manual

Page 142

Advertising
background image

136

CANNON

®

Automatic Viscometer Models CAV-2100 and CAV-2200 with VISCPRO

®

Instruction & Operation Manual

Version 2g — May, 2009; CANNON

®

Instrument Company

2139 High Tech Road • State College, PA 16803 • USA

Assembly procedure

1. Substitute the replacement thermometer and tighten the two opposing

0.05" Allen screws to secure the thermometer adaptor plate of the
new thermometer to the thermometer wire cable.

2. Replace the thermometer in the holder and suspend it vertically to

make certain that the thermometer scale is visible in the holder
aperture. Then push the thermometer tube top plug firmly into place
on the top of the holder to seat the two O-rings.

3. Replace the thermometer holder assembly in the bath by inserting it

through the circular aperture in the top bath flange. Gravity will hold
the assembly in place. View the thermometer through the front of the
bath unit and verify that the thermometer scale is still readable.
Adjust the thermometer position as necessary by rotating the ther-
mometer holder assembly and/or thermometer tube top plug.

4. Using the Phillips screwdriver, replace the screws securing the top

panels of the CAV-2200 to the Bath Unit frame.

5. Restore power to the CAV-2200 and load the VISCPRO controlling

software to begin testing samples. The replacement procedure is
complete.

Advertising