Installation, Receiver and servo connections, Installation when mc230cr is used – Futaba 4GWD User Manual
Page 18: Installation for gas powered models
Advertising
19
Installation
Installation
Receiver and Servo Connections
Installation When MC230CR Is Used
When connecting and installing the receiver and servos, read the "Installation
Safety Precautions" on the next page.
Installation For Gas Powered Models
Receiver
Battery holder
(CH4)
(CH2)
(CH1)
(B)
Power
switch
*Rubber band
Shift servo
Throttle servo
Steering servo
To motor connectors
To battery connector
(CH4)
(CH2)
(CH1)
Power switch
Steering servo
Shift
servo
Receiver
MC230CR
Advertising