1. Installation and Connection
1.1 Installation of the meter

Diag.13

a. Put volume titration unit(3) and control unit on table, put stirrer on potential measuring unit(16)

according to mentioned Diag13 and insert electrode pole(10); install beaker supporter (12) and
beaker(13) respectively, put stirring drop(14) into beaker(13), then tighten stirrer(15) and
beaker(13) with screws(25).

Diag14

b. Before titration, burette must be cleaned especially when you are going to do titration of different

concentrations or different solutions. Installation of burette (4) is shown on left side as diag14,
take out push rod tool from spare parts, connect it to the piston pole (51), shown as below