Replacing diaphragms and valves – VACUUBRAND MZ 2C NT +AK+M+D User Manual

Page 52

Advertising
background image

page 52 of 74

+

Please read section ”Replacing diaphragms and valves” com-

pletely before starting maintenance.

The pictures may show other versions of pumps. This does not change

the method of replacing diaphragms and valves.

Never operate the pump if covers or other parts of

the pump are disassembled.

Before starting maintenance,

disconnect the electri-

cal power cord. Wait five seconds after isolating the

equipment from AC power to allow the capacitors to

discharge.

Ensure that the pump cannot be operated accidentally.

Note: The pump might be contaminated with the pro-

cess chemicals that have been pumped during opera-

tion. Ensure that the pump is decontaminated before

maintenance.

Avoid the release of pollutants.

+

Never operate a defective or damaged pump.

+

Take adequate precautions to protect people from the

effects of dangerous substances that may have con-

taminated the pump and may be released upon dis-

assembly. Ensure that the maintenance technician is

familiar with the safety procedures which relate to the

products processed by the pumping system.

Use appropriate protective clothing, safety goggles

and protective gloves.

+

Check every motor capacitor regularly by measuring

its capacity and estimating its service life. Replace old

capacitors early enough to prevent a failure. The ca-

pacitors must be replaced by a trained electrician.

+

Allow sufficient cooling of the pump before starting

maintenance. Drain condensate, if applicable.

+

Vent the pump and isolate it from the vacuum sys-

tem before you start maintenance.

Replacing diaphragms and valves

Advertising