VACUUBRAND MZ 2C VARIO User Manual

Page 46

Advertising
background image

page 46 of 51

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 999034 / 22/04/2008

➨ Tighten union nut first by hand and then tighten by one full

turn using open-ended wrench.

➨ Reconnect hose to the inlet of the condenser and tighten

union nut.

➨ Use open-ended wrench to reconnect hose to elbow fitting.

Assembling the pumping unit

PC 2003 / PC 2004:
➨ Assemble pump at pump support. Support pump appropriately.

➨ Screw in at each case two socket head screws at the front of the pump an underneath the terminal box

with hex key size 5. Pay attention to washers.

➨ Position pump with pump support on the base plate and tighten the four hexagon nuts on the feet of the

pump support (open-ended wrench w/f 10).

➨ Reassemble connections at controller.

PC 2002:
➨ Use hex key size 7 to screw controller with socket head screw to holding plate.

➨ Reassemble connections at controller.

If the pump does not achieve the ultimate pressure:

☞ In case the diaphragms and valves have been replaced, a run-in period of several

hours is required before the pump achieves its ultimate vacuum.

If all pump heads achieve a vacuum below 120 mbar but pump does not achieve the
ultimate total pressure:
Check hose connectors between pump heads and manifolds for leaks. If necessary
recheck pump chamber.

Advertising
This manual is related to the following products: