VACUUBRAND MZ 2C VARIO User Manual

Page 7

Advertising
background image

page 7 of 51

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 999034 / 22/04/2008

Attention: The pump might be contaminated with process chemicals which have

been pumped during operation. Ensure that the pump is decontaminated before
maintenance and take adequate precautions to protect people from the effects of
dangerous substances if contamination has occurred.

☞ Before starting maintenance vent the pump, isolate the pump and other compo-

nents from the vacuum system. Allow sufficient cooling of the pump. Drain conden-
sate, if applicable. Separate the pump from the coolant circuit.

Repair of the gauge head VSK 5 is not possible.

In order to comply with law (occupational, health and safety regulations, safety at work
law and regulations for environmental protection) vacuum pumps, components and
measuring instruments returned to the manufacturer can be repaired only when certain
procedures (see section ”Notes on return to the factory”) are followed.

Advertising
This manual is related to the following products: