During operation – VACUUBRAND MV 2 NT VARIO User Manual

Page 35

Advertising
background image

page 35 of 106

Connect the pressure transducer via hose or small flange

connection to the vacuum application. Do not mount the

pressure transducer directly at the pump but close to the

application. The cross-section of the tubing should be as

large as possible.

Inside a vacuum system where evaporation occurs, e.g.,

a rotary evaporator, the vacuum is not uniform. For ex-

ample, a condenser can act as a pump, or the vacuum in

the connecting tubing can be higher or lower than in the

application itself. This affects the measurement results as

well as the control levels. Therefore, carefully choose the

position where to connect the pressure transducer.

Position the pressure transducer and its vacuum line in

such a way that condensate cannot flow towards the pres-

sure transducer. Condensate and deposits will affect the

measurement results. Clean the pressure transducer, if

necessary. See section “Cleaning the pressure transduc-

er”, pg. 66.

Installing the hose nozzle at the VSK 3000:

Unscrew the small flange. Slip hose nozzle with clamping

ring onto the vacuum connection and fasten with union

nut.

VACUU•BUS

The CVC 3000 controller uses VACUU•BUS protocol to

read out the pressure transducer via VACUU•BUS line.

Maximum cable length inside buildings: 32yd (30m).

VACUU•BUS extension cable 2.2 yd (2 meters): order-no.

612552.

During operation

Vent and dispose of

potentially dangerous gases or

vapors at the outlet of the pump appropriately.

Advertising
This manual is related to the following products: