Two line (lift system) – Sears Riello F10 User Manual

Page 12

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TWO LINE (LIFT SYSTEM)

D6008

f

Q.

2 LINE (LIFT)

SYSTEM - PIPE LENGTHS

H

3/8 ’ OD

1/2 ’ OD

FT

M

FT

M

FT

M

0.0

0.0

115

35

330

100

1.5

0.5

100

30

330

100

3.0

1.0

80

25

330

100

5.0

1.5

65

20

295

90

6.5

2.0

50

15

230

70

9.5

3.0

25

8

100

30

11

3.5

20

6

65

20

NOTE: Do not exceed pipe lengths

indicated in chart.

A)

If a two line system is required, install the By-pass plug (4) provided. The by-pass

plug is installed in the return port (9) of the pump. A 2.5 mm hexagonal key provided

with the by pass plug is to be used to install the plug. DO NOT use an inch size

hexagonal key, damage to the by-pass plug may result. When operating on a two line

system, supply and return lines should be the same diameter and both

should extend

to the same depth inside the fuel tank. Be sure there are no air leaks or blockages

in the piping system.

Any obstructions in the return line will cause failure of the pump shaft seal. Do not

exceed the pipe lengths indicated in the tables.

To install the by-pass plug:

1) Remove the return plug (9).

2) Install the by-pass plug (4) using the 2.5 mm hexagonal key.

B) Attach the two PIPE CONNECTORS (5) to the pump SUPPLY and pump RETURN
PORTS (6 and 9). Attach the required piping to these two pipe connectors using the
NPT/METRIC ADAPTERS that are supplied with the burner.

WARNING: Pipe dope or Teflon tape are NOT to be used on any direct oil con­

nection to the fuel pump.

WARNING: The height “P” in Pipe Length charts on page 9 and 10 should not
exceed 13 feet (4 m).

WARNING: The vacuum should not exceed 11.44 inches of mercury.

IMPORTANT: An external, appropriately listed and certified oil filter must be
placed in the fuel line between the fuel tank and the burner pump.

F 1 0 - 1 0