Tie down points and procedure, P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 40
Advertising
P80/PP25 Operator’s Manual
Transport - 39
CMW
Back Brace
Lift unit with back brace by attaching chain to lift
rings at front and back of back brace.
Lift back brace support by lift ring at top of support.
Tie Down Points and Procedure
Rod pusher, rod box, back brace, and trench box may be carried on any truck or trailer able to transport the
equipment gross weight.
•
Install all pins to hold rod pusher in place.
•
Use tie-downs to anchor equipment.
Advertising