Install Control Box and Cables

1.

Attach control box to mounting bracket with wing nuts.

2.

Attach current coil cable to top of current coil
assembly

Attach blue or green connector at (A).

Attach black connector at (B).

Attach brown or white connector at (C).

3.

Plug current coil into back of control box.

4.

Plug power cable into back of control box.

5.

Attach bonding cable to top of rod pusher.

6.

Connect grids on trench box floor and rod pusher
bonding cable at welded tabs.

7.

Connect grid mats by attaching bonding cables to
control box bracket.

Install Strobe Lights

1.

Plug other end of power cable into first strobe light.

2.

Place light on grid mat near trench box.

3.

Plug strobe light bonding cable into grid mat.

4.

Plug electric cable into strobe light. Plug other end of
cable into second strob light.

5.

Place second strobe light on trailer.

6.

Connect strobe light bonding cable to trailer or power
unit.