Test strike system, P80/pp25 operator’s manual – Ditch Witch P80 User Manual

Page 54

Advertising
background image

P80/PP25 Operator’s Manual

Push Rods - 53

Assemble Strike System

CMW

Test Strike System

If system fails any part of this test, see “Troubleshooting the Strike System” in MAINTENANCE. Do not
bore until test is completed successfully.

1.

Turn power switch on. Light above switch should come on.

2.

Check that Lo Main and Lo Backup lights are off.

3.

Press test button.

Horns on boring unit and power unit will sound.

Strobe lights on both units will flash.

Voltage and current hazard lights on alarm panel will light.

4.

Press reset button.

Strobes will stop flashing.

Green system lights will come on.

Advertising