P80/pp25 operator’s manual – Ditch Witch P80 User Manual
Page 44
Advertising
P80/PP25 Operator’s Manual
Push Rods - 43
Setup
CMW
7.
Install pins, as shown.
8.
Slide a rod through cylinder and install pilot head, as
shown.
9.
Fasten chain and lift rod pusher in level position. Lower
unit into trench.
10. Backfill and compact soil around trench box. Top 2’
(600 mm) of soil must be well compacted.
Advertising