P80/pp25 operator’s manual – Ditch Witch P80 User Manual

Page 44

Advertising
background image

P80/PP25 Operator’s Manual

Push Rods - 43

Setup

CMW

7.

Install pins, as shown.

8.

Slide a rod through cylinder and install pilot head, as
shown.

9.

Fasten chain and lift rod pusher in level position. Lower
unit into trench.

10. Backfill and compact soil around trench box. Top 2’

(600 mm) of soil must be well compacted.

Advertising