Push Rods - 46

P80/PP25 Operator’s Manual

Setup

CMW

T-Bar

1.

Dig T-Bar trench a minimum of 6” (150 mm) wide.

2.

Dig rod pusher trench a minimum of 9” (230 mm) wide. Do
not break edges or corners of T-Bar trench.

3.

Dig rod trench, as shown. Trench should be slightly longer
than rod being used. Level and compact trench floors.

4.

Dig target trench deep enough to meet bore path and long
enough to remove rod.

5.

Set T-bar on cylinder and install clip pins.