Arrange grid mats, P80/pp25 operator’s manual – Ditch Witch P80 User Manual

Page 50

Advertising
background image

P80/PP25 Operator’s Manual

Push Rods - 49

Assemble Strike System

CMW

Arrange Grid Mats

A. Bore Path B. Trench Box C. Trailer D. Strike System Control Box E. Power unit

1.

Arrange grid mats around trench box.

2.

Arrange grid mats between trench box and trailer.

3.

Stake grid mats.

4.

Place floor grids on rail on trench box floor. Position grids
at end opposite rod pusher and with bonding cables on
same side as welded tab.

Advertising