Push Rods - 50

P80/PP25 Operator’s Manual

Assemble Strike System

CMW

Assemble Bonding Equipment

1.

Drive voltage stake into ground at least 6 ft (2 m) from
starting trench.

2.

Clip voltage limiter to voltage stake.

3.

Connect cable from voltage limiter to back of control
box and lock with 1/4 turn.

4.

Connect bonding cables to grid mats.

5.

Drive ground rod into soil near grid mats.

6.

Move cords and cables under grid mats.