Rt45 operator’s manual – Ditch Witch RT45 User Manual

Page 172

Advertising
background image

RT45 Operator’s Manual

Service - 175

As Needed

CMW

®

8.

Loop cable through links nearest connector
pin.

9.

Loosen plug on grease cylinder or turn tension bolts counterclockwise to relieve chain tension.

10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.

11. Unclamp links. Slowly release cable and lower chain to ground.

12. Lay chain on ground with teeth down.

Fluid pressure could pierce skin and cause injury

or death. Stay away.

To help avoid injury:

Service digging boom grease cylinder only while standing on opposite side of boom.

Wear gloves and safety glasses, and cover fitting with cloth when relieving pressure in
cylinder.

Crushing weight could cause death or serious

injury. Use proper procedures and equipment or stay away.

Advertising