Harmonic Resolution Systems SXR Audio Stand User Manual

Page 16

Advertising
background image

Isolation Base Installation into SXR Frame - Uncrate each of the isolation bases
if not already complete. Make sure you read and follow all of the instructions in
the isolation base manual prior to installing into the SXR Audio Stand frame. You
will want to verify that the frame size matches the isolation base size. The SXR-
1921 uses the 1921 isolation bases. The SXR-1719 uses the 1719 isolation bases.

Match the load range of each isolation base with the component weight. Matching
the isolation base to the proper component weight will insure optimum
performance. The load range can be changed for a nominal factory fee so if you
do not have the correct load range for a component, please contact Harmonic
Resolution Systems or your local certified retail location to arrange to have this
corrected.

Load the Isolation Bases into the SXR Frame (see Photo 17 and 18), with the HRS
logo facing the front of the rack system. Be sure that the isolation base (shelf) foot
is located securely in the pocket of the SXR Frame Support Brace. This will
automatically occur when the front and back edge of the isolation base is in line
with the front and back face of the frame. If the front and back edges do not line up
with the front and back of the frame structure then, contact Harmonic Resolution
Systems or your certified retail location because you do not have the proper size
isolation base or frame.

Photo 16

Advertising