Space requirements, Overhead clearance, Your next step – Labconco PuriCare Bedding Disposal Stations 3840020 User Manual

Page 11

Advertising
background image

7

Product Service 1-800-522-7658

Chapter 2: Prerequisites


All PuriCare Stations with model numbers ending in –
00 to –09 are designed for operation at 115 volts, 60Hz,
alternating current. PuriCare Stations with model
numbers ending in –20 to –29 are designed for
operation at 230 +/- 20 volts, 50 Hz alternating current.
A dedicated outlet with a circuit breaker rated at 10
amps should be located as close as possible to the right
rear side of the station.

Always follow the plug
manufacturer’s instructions for the
proper assembly and testing of the
plug and power cord.

Space Requirements


The dimensions for the different models are shown in
Appendix B: Bedding Disposal Station Dimensions.

Overhead Clearance


In order for the bedding disposal station to operate
properly, there must be at least six inches (150 mm)
clearance from any overhead obstructions when the
station is in its final operating position.

Your Next Step


After you have determined that the location you have
selected accommodates the installation and operational
requirements of your station, you are ready to begin
installation. Proceed to Chapter 3: Getting Started.

!

Advertising
This manual is related to the following products: