LINK Systems OmniLink 5000 User Manual

Page 64

Advertising
background image

April 17, 2000

Man ual Revisio n 1.0

7.9

Section 7.4

Strain Gauge Wiring

1)

Run flexible or rigid conduit from the strain gauge protective boxes to the control enclosure that
contains the OmniLink 5000 card rack. Entry into the control enclosure should be as close as
possible to the tonnage monitor module.

2)

Pull the strain gauge cables through the conduit from the strain gauge locations to the control
enclosure. Once inside the enclosure route the strain gauge cables away from all other voltage
sources, as much as possible. Run cables to the channel connectors on the front of the tonnage
monitor module and cut the excess cable lengths off.

3)

Strip about 2 ½ inches of cable insulation off of the braided wire shield. Remove the four
conductor wires from the shield, taking care to leave the shield wire length connected to the
cable.

4)

Wire the channel connectors as shown in Figure 7.10. Cover or tape the shield, to avoid
accidental shorting to any other point.

Figure 7.10: Strain Link Wiring