4) Place the hardened drill fixture provided with

the direct mounting strain gage kit in position
adjacent to the scribed line. Use a number 3
drill to drill a 5/8" deep hole in the mounting
surface through the center hole position of the
drill fixture. Tap the hole for a 1/4 x 28 thread.
Bolt the drill fixture securely to the mounting
area, as shown in Figure 32.

Drill

Fixture

Drill

Fixture

5) Use a number 3 drill to drill 5/8” deep holes in

the mounting surface through the remaining
four holes in the drill fixture. Tap the holes for
a 1/4 x 28 thread after removing the drill
fixture.

NOTE:

Do not attempt to locate and drill
mounting holes without using the
drill fixture. The hole pattern

Figure 32: Strain Gage Drill Fixture


must be precise.

6) De-burr the mounting holes and wipe the

mounting area with a clean rag.


7) Mount the strain gage as shown in Figure

33. Make certain that the washers provided
with the strain gage kit are placed over the
strain gages, not under them. Torque the
1/4 x 28 bolts to 150 in-lbs. A calibrated
torque wrench is the preferred tool to torque
the bolts.

8) Mount the protective cover box provided in

the strain gage kit, if used, centrally over the
strain gage. It is important to mount the
cover box before calibration begins. The
cover box mounting holes may slightly
change the strain sensed by the strain gage.

LST-1000

Strain Gage

6.7.2 Intermediate Weld Pad Mounting

1) Select the desired mounting locations for the strain gages.

2) Remove paint, oil, grease, etc., to obtain a bare metal surface slightly larger than the LST-1000

strain gage.

3) Clean the mounting surface with a solvent, removing all contaminants.

Washers

LST-1000

Strain Gage

Washers

Figure 33: LST-1000 Strain Gage Mounting