Estimating power before starting the fpga design, Table 2–1 – Altera PowerPlay Early Power Estimator User Manual

Page 12

Advertising
background image

2–2

Altera

Corporation

PowerPlay Early Power Estimator For Stratix II, Stratix II GX & HardCopy II

January 2007

Estimating Power

To use the PowerPlay Early Power Estimator, enter the device resources,
operating frequency, toggle rates and other parameters in the PowerPlay
Early Power Estimator. If you do not have an existing design, then you
need to estimate the number of device resources your design uses in
order to enter the information into the PowerPlay Early Power Estimator.

Estimating Power Before Starting the FPGA Design

FPGAs provide the convenience of a shorter design cycle and faster
time-to-market than ASICs or ASSPs. This means that the board design
often takes places during the FPGA design cycle, and the power planning
for the device can happen before any of the FPGA design is complete.

Table 2–1

shows the advantages and disadvantages of using the

PowerPlay Early Power Estimator spreadsheet before you begin the
FPGA design.

To estimate power usage with the PowerPlay Early Power Estimator
spreadsheet if you have not started your FPGA design, perform the
following steps:

1.

Download the PowerPlay Early Power Estimator spreadsheet from
the Altera website (www.altera.com).

2.

Select the target family, device, and package from the PowerPlay
Early Power Estimator’s Family, Device, and Package sections.

3.

Enter values for each section in the PowerPlay Early Power
Estimator. Different worksheets in the file display different power
sections, such as clocks and PLLs. Power is calculated automatically,
and subtotals are given for each section.

4.

The calculator displays the estimated power usage in the Total
section.

Table 2–1. Power Estimation Before Designing FPGA

Advantages

Disadvantages

Power estimation can be
performed before starting your
FPGA design

Accuracy depends on your inputs and
your estimation of the device resources;
where this information may change
(during or after your design is
complete), your power estimation
results may be less accurate

Process can be time consuming