Finalizing the installation, Steps for finalizing the installation, For qualified installers only) – Avalon Firestyles 864 TRV GS2 Installation User Manual

Page 47

Advertising
background image

Finalizing the Installation

(for qualified installers only)

47

Travis Industries

4140611

100-01385

Steps for Finalizing the Installation

1. Remove the glass (see page 49).

NOTE:

If using propane (LP) convert the appliance prior to installing the logs.

2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected

once it enters the firebox, ensuring gas does not build up.

3. Make sure the two accent light bulbs are in place.

NOTE: .Take care to not touch the bulb with your fingers (use a cloth or paper towel).

4. Install the four AA batteries (included in the owner’s pack) into the battery holder (see the illustration below). The

AA batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included
in the owner’s pack) into control panel light assembly (see the illustration below). The battery holder is held in
place with Velcro and may be removed for easier access.

5. Install the logs (see page 52).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.

AA Battery

AA Battery

Lift up and swing the lower

grill down to acces the area
below the firebox.

Swing the concealment

cover up and slide it back to
expose the controls.

AA

Battery

Holder

AA Battery Tray

AA Battery

AA Battery

Battery for Control

Panel Lights

9v

Battery

Advertising
This manual is related to the following products: