BrightSign Network WebUI Permissions User Guide v.1.0 User Manual

Page 12

Advertising
background image

10

Senior Network Managers

You need to expand the role of the Network Manager so that he can add and edit schedules in addition to maintaining
the network of BrightSign players. He is not involved with the daily activity of menu revisions and updates, so you don’t
want him to have control of adding or removing the presentations on a schedule.

You will need to modify the default permissions of the Network Manager in a more minute way than allowing or denying
“full control” of a category. On the permissions page, click the arrow symbols next to the Schedule and Group operations
categories to expand the list of permissions. These expanded menus enable you to allow or deny specific actions within
an operations category. Enable “Add Presentation” and “Remove Presentation” in the Schedule category, and enable
“Change Schedule” in the Group category. You have now expanded the permissions of your Network Manager without
having to enable full control of an operations category.

Advertising