Space Ray ETS Series User Manual

Page 22

Advertising
background image

Form 43343300
May 2013

-21-

10.0)

ASSEMBLY OF TUBE SECTIONS

Sheet metal parts, particularly reflectors and vent have sharp

edges. Always use gloves when handling.

Failure to do so may result in death, serious injury or property

damage.

CUT HAZARD

During field assembly of the heater tube sections, the recommended procedure is as follows:

1.

Before hanging heater sections, first determine the actual layout of the system (see Sections 7.0) & 8.0) for

details). Consideration must also be taken for flue pipe, fresh air ducting, gas piping, clearances to
combustibles, etc. before hanging heater. Typical suspension methods are shown in Section 9.0).

2.

Hang each tube section individually. DO NOT

DO NOT

DO NOT

DO NOT attach the heater tube sections together on the ground and

attempt to hang the entire system.

3.

The first 10’ tube section must be either aluminized steel (40-200 MBtu/hr models with 12-radial hole

flange) or Alumi-Therm (225-250 MBtu/hr models with 6-hole flanges) as the primary heat exchanger and
the control box connected directly to these tube sections. Failure to attach the control box to the flange end

Failure to attach the control box to the flange end

Failure to attach the control box to the flange end

Failure to attach the control box to the flange end

as indicated above will void the manufacturer’s warranty.

as indicated above will void the manufacturer’s warranty.

as indicated above will void the manufacturer’s warranty.

as indicated above will void the manufacturer’s warranty.

4.

Place a tube support/hanger bracket on the end of the heat exchanger tube having the mounting flange.

Align the tube such that the welded seam is facing down toward the ground. Failure to assemble the tube

Failure to assemble the tube

Failure to assemble the tube

Failure to assemble the tube

with the seam facing down will VOID the manufacturer’s warranty.

with the seam facing down will VOID the manufacturer’s warranty.

with the seam facing down will VOID the manufacturer’s warranty.

with the seam facing down will VOID the manufacturer’s warranty.

5.

Space the tube support/hanger bracket 6 inches from center of its slotted holes to the front face of the

mounting flange. Secure the tube to the support/hanger bracket using a “U” Bolt clamp and two (2) 5/16-18
nuts provided. For U-tube configuration, see typical assembly overview illustration in Section Error!

Error!

Error!

Error!

Reference source not found.

Reference source not found.

Reference source not found.

Reference source not found.

6.

Suspend the chain to attach the wire hanger and the tube support bracket. Insert the tube into the wire

hanger and then raise the tube support bracket end up to the suspension chain, use “S” hooks to attach the
wire hanger and tube support bracket to the chain.

Failure to assemble the tube with the seam facing down will VOID the

Failure to assemble the tube with the seam facing down will VOID the

Failure to assemble the tube with the seam facing down will VOID the

Failure to assemble the tube with the seam facing down will VOID the
manufacturer’s warranty.

manufacturer’s warranty.

manufacturer’s warranty.

manufacturer’s warranty.

Weld seam to the

bottom of tube.

END VIEW

4"OD x 10Ft. Heat

Treated Aluminized

Steel Tube

Control Box

Mounting Flange

1

2

8’ to 9’ 1/4”

Maximum 6” distance from

control box mounting flange

to tube support bracket.

Tube Support/

Hanger Bracket

Wire Hanger

U-Bolt Clamp

& 5/16” Hex Nuts

S Hooks

Advertising
This manual is related to the following products: