Verifying the installation – H3C Technologies H3C S5130 Series Switches User Manual

Page 24

Advertising
background image

17

3.

Connect the other end of the power cord to the RPS.

Figure 24 Connecting an RPS cord to an S5130-52S-EI switch

Verifying the installation

After you complete the installation, verify that:

There is enough space for heat dissipation around the switch, and the rack or workbench is stable.

The grounding cable is securely connected.

The correct power source is used.

The power cords are correctly connected.

All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection and lightning arresters for network ports have been correctly

connected.

Advertising