H3C Technologies H3C S5130 Series Switches User Manual

Page 63

Advertising
background image

56

technical specifications,

42

port mode

LED,

47

power module

cable,

14

connecting –48 VDC power source,

16

connecting AC power source,

15

connecting RPS,

16

failure (troubleshooting),

28

grounding switch through AC power module PE
wire,

11

installation,

12

,

13

LED,

46

removal,

12

,

13

powering on switch,

19

preparing for installation,

1

preventing

EMI prevention,

2

procedure

configuring IRF basic settings,

26

connecting –48 VDC power source,

16

connecting AC power source,

15

connecting IRF physical ports,

26

connecting power cord,

14

connecting RPS,

16

grounding switch through AC power module PE

wire,

11

grounding switch with grounding conductor

buried in the earth ground,

11

grounding switch with grounding strip,

9

grounding the switch,

9

identifying IRF master switch,

22

identifying IRF member switch physical ports,

24

installing power module,

13

installing switch,

4

installing switch on 19-inch rack,

4

maintaining the switch,

28

mounting switch on workbench,

8

planning IRF connections,

23

planning IRF fabric installation site,

22

planning IRF member IDs,

22

planning IRF topology,

23

removing power module,

13

setting up IRF fabric,

21

troubleshooting fixed power module failure,

28

troubleshooting garbled terminal display,

30

troubleshooting hot-swappable power module

failure,

29

troubleshooting no terminal display,

30

troubleshooting power module failure,

28

troubleshooting the switch,

28

R

rack

attaching mounting bracket to switch chassis,

5

mounting switch to workbench,

8

mounting the switch,

7

switch installation on 19-inch rack,

4

verifying switch installation (19-inch rack),

17

removing

power module,

12

,

13

RPS

connecting,

16

LED,

46

S

safety

EMI prevention,

2

grounding switch through AC power module PE
wire,

11

grounding the switch,

9

grounding the switch with grounding conductor

buried in the earth ground,

11

grounding the switch with grounding strip,

9

installation site cleanliness,

2

installation site dust concentration,

2

installation site gas saturation,

2

installation site humidity,

2

installation site temperature,

2

laser safety recommendations,

3

recommendations,

1

setting

IRF fabric,

21

switch configuration environment,

18

terminal parameters,

19

SFP+

port,

45

port LED,

50

site

cleanliness,

2

dust concentration,

2

Advertising