Verifying the installation, Powering on the device – H3C Technologies H3C WX5500E Series Access Controllers User Manual

Page 34

Advertising
background image

28

Verifying the installation

Before powering on the device, verify that:

The correct power source is used.

The grounding cable is securely connected.

The console cable and power cord are correctly connected.

All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with a lightning protector for network ports has been properly connected.

Powering on the device

1.

Power on the device. The device initializes its memory and runs the BootWare. The following

information appears on the terminal screen:

System is starting...

Press Ctrl+D to access BASIC-BOOTWARE MENU

Booting Normal Extend BootWare....

The Extend BootWare is self-decompressing......Done!

****************************************************************************

* *

* H3C WX5540E BootWare, Version 1.01 *

* *

****************************************************************************

Compiled Date : Mar 21 2013

CPU Type : XLP432

CPU Clock Speed : 1400MHz

Memory Type : DDR3 SDRAM

Memory Size : 8192MB

Memory Speed : 1333MHz

BootWare Size : 768KB

Flash Size : 16MB

cfa0 Size : 4002MB

CPLD1 Version : 002

CPLD2 Version : 002

PCB Version : Ver.A

BootWare Validating...

Press Ctrl+B to enter extended boot menu...

2.

Press Ctrl + B at the prompt within 4 seconds to access the Boot menu. Otherwise, the system enters

the system image file reading and self-compressing process.
To access the Boot menu after the system enters the system image file reading and self-compressing

process, restart the device.

Starting to get the main application file--cfa0:/main.bin!...

............................................................

Advertising
This manual is related to the following products: