Installation – England's Stove Works 25PAH User Manual

Page 12

Advertising
background image

12

IMPORTANT! READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING

CLEANING THE UNIT AS SPECIFIED, AND REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.

ENGLAND’S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR

DUE TO UNSAFE INSTALLATION OR USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH QUESTIONS.

INSTALLATION 

 

Approved Venting Method 2: Through the Ceiling 

 

 Venting through the ceiling/roof may be the only 

feasible venting option in some cases and is a factory 
recommended installation. 

 When installing any venting system, Type L or Type 

PL pipe must be used and all clearances to 
combustibles listed by the pipe manufacturer must 
be strictly adhered to. 

 Use the pipe manufacturer’s approved ceiling 

support for passing through a combustible ceiling, as 
well as the required firestops, radiation shields, 
flashing and storm collar. 

 Be certain to follow the manufacturer’s required 

height of termination above the roof line, and 
maintain at least the minimum clearances to 
combustibles. 

 Use an appliance collar where the pellet vent 

connects to the exhaust output of the pellet stove 

and attach the appliance collar to the exhaust blower output using three sheet metal 
screws.  

 Seal each pipe connection joint with high temperature RTV Silicone, to ensure the system is 

leak free (Check with the specific pipe manufacturer’s instructions before doing so). 

 If the pellet vent pipe being used is not a “Twist Lock” system, three (3) sheet metal screws 

are required at each pipe joint. 

 Connect the pellet stove to outside combustion air using the kit included with your stove or 

using an alternative method, as described in the “Outside Air” section, on page 15. 

 This venting method can also be modified so that the venting system runs horizontally 

through the wall from the stove, then transitions to vertical and terminates above the 
roofline.  When using this modified version of this installation be certain to carefully follow 
the venting system manufacturer’s instructions diligently. 

 

Please Note: Installation diagrams are for reference purposes only and are not drawn to scale, nor
meant to be used as plans for each individual installation. Please follow all venting system
requirements, maintain the required clearances to combustibles, and follow all local codes.

For high altitude installations (above 4,000
ft.), the vent pipe should be increased from

3-inch (3”) to four-inch (4”).

Advertising
This manual is related to the following products: