Chapter 4: hardware setup, Preparing the hardware installation, Installing the system memory – Lanner LEC-7950 User Manual

Page 18: Chapter 4, Hardware setup

Advertising
background image

17

Hardware Setup

Chapter 4

Embedded and Industrial Computing

Note:

The motherboards can support up to 16 GB

1.

memory capacity in maximum.

The system supports DDR3

2.

1066/1333/1600MHz SO-DIMM. Do not install

memory module with different specifications.

Chapter 4:

Hardware Setup

Preparing the Hardware Installation

To access some components and perform certain service

procedures, you must perform the following procedures

first.

WARNING: To reduce the risk of personal injury,

electric shock, or damage to the equipment,

remove the power cord to remove power from the

server. The front panel Power On/Standby button

does not completely shut off system power.

Portions of the power supply and some internal

circuitry remain active until AC power is removed.

Unpower the LEC-7950 and remove the power cord.

1.

Unscrew the 4 rubber feet from the bottom cover of

2.

the LEC-7950 System.

Open the cover.

3.

Note: In order to take off the bottom cover, you will

also need to take off the CF/SIM card protection

cover first.

Installing the System Memory

The motherboard supports DDR3 memory to meet the

higher bandwidth requirement of the latest operating

system and Internet applications. It comes with two

double data rate type three (DDR3) small outline dual in-

line memory module (SO-DIMM) sockets.

1

2

Advertising